Document Type : Research Paper
Authors
1 Assistant Professor Economic, Social and Extension Research Department, Zanjan Agricultural and Natural Resources Research and Education Center, AREEO, Zanjan, Iran
2 استادیار بخش تحقیقات حفاظت خاک و آبخیزداری مرکز تحقیقات و آموزش کشاورزی و منابع طبیعی زنجان
3 Assistant Professor, Soil Conservation and Watershed Management Research Institute, Agricultural Research, Education and Extension Organization (AREEO), Tehran, Iran
Abstract
Introduction
One of the important problems in the process of implementing and maintaining watershed projects and natural resources is the lack of effective participation and cooperation of watershed residents. Based on this, it is necessary and inevitable to pay attention to the inhibiting factors and also to identify ways to strengthen the participation of local communities in the process of implementing watershed and natural resources projects. This research, was done with the aim of knowing the socio-economic characteristics of local communities, identifying indicators that are effective in reducing obstacles and increasing people's participation in the implementation of natural resources and watershed projects, knowing the expectations and needs of the local community and finally, scientific and technical solutions have been presented to increase the level of public participation in Arpachai pilot area of Zanjan Province .
Materials and methods
In this study, four influential indices, including social-cultural, economic, natural, and managerial, were identified and categorized with 40 sub-indices. Necessary information was collected through surveys, questionnaires, interviews, and multiple sessions with community members and local experts. The sample size was determined using the Cochran formula, and the collected data were analyzed using SPSS software. Also, to check the validity of the questionnaire from Cronbach's alpha, factor analysis was used in order to reduce and categorize the variables affecting people's non-participation in watershed management projects.
Result and discussion
The results showed that six factors explain 64.4% of the variance of the dependent variable and the education and information variable at the local level was recognized as the most effective factor that explained 29.97% of the variance of the dependent variable. Following that, the factors of improving the income and livelihood of villagers with 19.24%, diversity of economic activities and improving performance with 18.93%, strengthening the local economy with 13.92%, management of watershed projects with 11.34% and natural resources management with 4.3% were placed in the second to sixth priority, respectively.
Conclusion
In general, it can be said that the lack of information and awareness of the local community about the positive economic, social, natural and technical aspects and benefits resulting from the implementation of natural resources and watershed management projects in the area of their living and production is one of the important obstacles in the lack of participation and failure to achieve the anticipated goals in the implementation of watershed and natural resources projects in the study area. Based on this, attention and emphasis on the issue of building trust and increasing the level of social trust in the General Administration of Natural Resources and Watershed Management plays a significant role in the process of implementation and success of projects.
Keywords